Building a hardware product in India

What to ask a contract manufacturer before the first order

14 November 2026 · Shalaka engineering team

The first order with a contract manufacturer (CM) sets the pattern for everything after it. A weak first build costs a month of rework, and the issues are usually visible in advance if you ask the right questions. Here is the list we work through.

Capability

Ask what the line can actually do, not what the brochure lists. Which smallest passive size and finest pitch can it place? Can it handle BGA and QFN parts, and does it check them with X-ray? Does it have reflow profiles for lead-free alloys, selective or wave soldering for through-hole parts, and conformal coating if you need it? Ask to see the line and the stencil printer, and look at how reels and moisture-sensitive parts are stored and baked.

Test

A board that passes visual inspection can still be dead. Ask which inspection steps are standard: solder paste inspection, automated optical inspection after reflow, in-circuit test, and functional test. For small volumes, a flying probe or a simple test fixture may be the sensible choice. Agree who designs the test jig and writes the test procedure. We prefer that the product team defines pass and fail limits, since the CM does not know what correct looks like for your device.

Quality records

Ask for the quality system they follow, such as ISO 9001, and ask how they handle nonconformities. What do they record for each lot: reflow profile, inspection results, rework done? Can they give you a report for a batch? How do they treat ESD, and how do they handle parts returned from the field?

Design feedback

A good CM reads your files before quoting and sends back questions: pad sizes, tombstoning risk on small passives, missing fiducials, panel design, polarity marking, test point access. Ask for this design for manufacturing review in writing. If a CM quotes without a single question, that is not a good sign.

Minimum order quantity

Ask about MOQ on assembly and on components. Reel quantities for passives often exceed what a small build needs, and some CMs charge for the leftover or hold it. Clarify who buys components, who owns leftovers and what happens to partial reels.

Traceability

Can you trace a unit back to its board lot, component lot codes and the date it was built? Serial numbers on boards, with the records linked to them, make a field failure far easier to investigate and a recall smaller.

What this does not cover

These questions assess a CM on paper and in a visit. A small pilot build, with a full inspection of the result, is still the best test of how they work.


If you are choosing a build partner for your first batch, book a discovery call. We support this under production support and PCB design.

Tell us what you are building.

A 30-minute discovery call with an engineer. We reply within 48 hours.

Book a discovery call