Skip to content
← Engineering notes

Micro-apps and AI agents

A morning energy report on WhatsApp: what to send and what to leave out

14 November 2026 · Shalaka engineering team

Energy dashboards get opened in the first week and rarely after. A message that arrives on the plant head’s phone at the start of the shift gets read. The work is deciding what goes in it, and the discipline is leaving things out.

What to send

Read the cumulative kWh register from each Modbus meter every minute or so, store the raw counter, compute yesterday’s use per line from the difference, and send a short message:

  • Total energy for yesterday in kWh, and the change against the day before and the same weekday last week.
  • Use per line or major machine group, the top few only.
  • Peak demand in kW or kVA (maximum demand, on a tariff billed in kVA) and the time it happened, if you pay a demand charge.
  • Power factor, if it fell below the level where your tariff adds a penalty.
  • Energy per unit produced, when production counts are available. It is more useful than raw kWh, because a quiet day always looks good.

Add one line that flags an odd result, such as a line that used power on a day it was meant to be off.

What to leave out

Leave out voltage and current for every phase, every meter’s name and long tables. Those belong on the dashboard. A message that needs scrolling is a message nobody finishes. Four to eight lines is a good target. Link to the full view for those who want it.

Do not send a number you cannot stand behind. If a meter did not report for six hours, say so in the message instead of showing a low total as fact.

WhatsApp Business API, in general terms

Messages that a business starts, such as a daily report, generally need a pre-approved message template, sent through a WhatsApp Business API provider. Templates have fixed text with variables for the numbers. The recipient also needs to have opted in to receive such messages from you. Replies from a person open a limited window in which free-form answers are allowed, which is how a plant head can ask for another line or day.

Template categories, rules and charges change, so read the current Meta and provider documentation before building. Keep the template text plain, and keep a record of opt-in for each number.

Choose the time and the people

Send before the shift meeting, not at midnight. Offer a stop option. A shorter list of recipients, each with a reason to read it, keeps the channel useful.

Limits

A morning message tells people what happened yesterday. It does not stop a compressor left running overnight. For that you need a live alert on a threshold, which is a different message with a different audience.


If you want daily energy figures to reach the shop floor and the office, see our micro-apps for electronics and manufacturing and book a discovery call.

Tell us what you are building.

A 30-minute discovery call with an engineer. We reply within 48 hours.

Book a discovery call